Strat from
Walajabad Bus Stand
Then go 0.6 K.M. to
Walajabad Railway Station (1380)
Then go 0.33 K.M. to
Sekkadu
Then go 1.38 K.M. to
Oothukadu Cross Road (1443)
Then go 2.04 K.M. to
Nathanallur (1459)
Then go 1.44 K.M. to
Maduranallur (1491)
Then go 1.13 K.M. to
Deveriambakkam
Then go 1.18 K.M. to
Thalayampattu
Then go 0.76 K.M. to
Varanavasi (1665)
Then go 1.63 K.M. to
Kunnarakkan (1710)
Then go 1.37 K.M. to
Panruti (5047)
Then go 1.37 K.M. to
Kandigai (1709)
Then go 0.83 K.M. to
Ezhichur Koot Road Junction (1719)
Then go 1.84 K.M. to
Oragadam Road Junction (1766)
Then go 2.17 K.M. to
Vattambakkam (1815)
Then go 2.38 K.M. to
Crescent Lake Junction (1917)
Then go 0.69 K.M. to
Serapanacheri
Note:These Directions are extracted from MTC Route 579A .
One ways are not considered while preparing route
|
CLICK HERE TO VIEW IT ON MAP
|
|